Uganda: Selected Issues

· International Monetary Fund
E‑kniha
87
Stránky
Hodnocení a recenze nejsou ověřeny  Další informace

Podrobnosti o e‑knize

This Selected Issues paper describes Uganda’s experience under the 2013 Policy Support Instrument (PSI). The current 2013 PSI was approved by the IMF’s Executive Board in June 2013 with an initial duration of three years. Overall, performance under this PSI has been assessed to be satisfactory. Most quantitative assessment criteria were met, and macroeconomic stability maintained. However, the pace of structural reforms slowed down compared with the past, and only about half of the structural benchmarks were ultimately met. The experience shows the importance of ensuring commitment to the reforms, explaining them better, and getting broad-based buy-in to achieve progress.

Ohodnotit e‑knihu

Sdělte nám, co si myslíte.

Informace o čtení

Telefony a tablety
Nainstalujte si aplikaci Knihy Google Play pro AndroidiPad/iPhone. Aplikace se automaticky synchronizuje s vaším účtem a umožní vám číst v režimu online nebo offline, ať jste kdekoliv.
Notebooky a počítače
Audioknihy zakoupené na Google Play můžete poslouchat pomocí webového prohlížeče v počítači.
Čtečky a další zařízení
Pokud chcete číst knihy ve čtečkách elektronických knih, jako např. Kobo, je třeba soubor stáhnout a přenést do zařízení. Při přenášení souborů do podporovaných čteček elektronických knih postupujte podle podrobných pokynů v centru nápovědy.