Uganda: Selected Issues

· International Monetary Fund
ای-کتاب
87
صفحه‌ها
رده‌بندی‌ها و مرورها به‌تأیید نمی‌رسند.  بیشتر بدانید

درباره این ای-کتاب

This Selected Issues paper describes Uganda’s experience under the 2013 Policy Support Instrument (PSI). The current 2013 PSI was approved by the IMF’s Executive Board in June 2013 with an initial duration of three years. Overall, performance under this PSI has been assessed to be satisfactory. Most quantitative assessment criteria were met, and macroeconomic stability maintained. However, the pace of structural reforms slowed down compared with the past, and only about half of the structural benchmarks were ultimately met. The experience shows the importance of ensuring commitment to the reforms, explaining them better, and getting broad-based buy-in to achieve progress.

رده‌بندی این کتاب الکترونیک

نظرات خود را به ما بگویید.

اطلاعات مطالعه

تلفن هوشمند و رایانه لوحی
برنامه «کتاب‌های Google Play» را برای Android و iPad/iPhone بارگیری کنید. به‌طور خودکار با حسابتان همگام‌سازی می‌شود و به شما امکان می‌دهد هر کجا که هستید به‌صورت آنلاین یا آفلاین بخوانید.
رایانه کیفی و رایانه
با استفاده از مرورگر وب رایانه‌تان می‌توانید به کتاب‌های صوتی خریداری‌شده در Google Play گوش دهید.
eReaderها و دستگاه‌های دیگر
برای خواندن در دستگاه‌های جوهر الکترونیکی مانند کتاب‌خوان‌های الکترونیکی Kobo، باید فایل مدنظرتان را بارگیری و به دستگاه منتقل کنید. برای انتقال فایل به کتاب‌خوان‌های الکترونیکی پشتیبانی‌شده، دستورالعمل‌های کامل مرکز راهنمایی را دنبال کنید.