Uganda: Selected Issues

· International Monetary Fund
ای بک
87
صفحات
درجہ بندیوں اور جائزوں کی تصدیق نہیں کی جاتی ہے  مزید جانیں

اس ای بک کے بارے میں

This Selected Issues paper describes Uganda’s experience under the 2013 Policy Support Instrument (PSI). The current 2013 PSI was approved by the IMF’s Executive Board in June 2013 with an initial duration of three years. Overall, performance under this PSI has been assessed to be satisfactory. Most quantitative assessment criteria were met, and macroeconomic stability maintained. However, the pace of structural reforms slowed down compared with the past, and only about half of the structural benchmarks were ultimately met. The experience shows the importance of ensuring commitment to the reforms, explaining them better, and getting broad-based buy-in to achieve progress.

اس ای بک کی درجہ بندی کریں

ہمیں اپنی رائے سے نوازیں۔

پڑھنے کی معلومات

اسمارٹ فونز اور ٹیب لیٹس
Android اور iPad/iPhone.کیلئے Google Play کتابیں ایپ انسٹال کریں۔ یہ خودکار طور پر آپ کے اکاؤنٹ سے سینک ہو جاتی ہے اور آپ جہاں کہیں بھی ہوں آپ کو آن لائن یا آف لائن پڑھنے دیتی ہے۔
لیپ ٹاپس اور کمپیوٹرز
آپ اپنے کمپیوٹر کے ویب براؤزر کا استعمال کر کے Google Play پر خریدی گئی آڈیو بکس سن سکتے ہیں۔
ای ریڈرز اور دیگر آلات
Kobo ای ریڈرز جیسے ای-انک آلات پر پڑھنے کے لیے، آپ کو ایک فائل ڈاؤن لوڈ کرنے اور اسے اپنے آلے پر منتقل کرنے کی ضرورت ہوگی۔ فائلز تعاون یافتہ ای ریڈرز کو منتقل کرنے کے لیے تفصیلی ہیلپ سینٹر کی ہدایات کی پیروی کریں۔